Construction site can not afford to play tricks View one: waterproof engineering For covert waterproof works, the most important thing is to do meticulous construction. First of all, before the renovation, the construction personnel must do a 24-hour water-retaining test. After confirming that there is no leakage, clean up the ground debris, remove the loose parts, and then use a cement mortar to smooth the uneven areas, and then the entire Flattened on the large surface. Closed water test can also play a role in distinguishing and determining the responsibility of the waterproofing project. There is a leakage phenomenon responsible for the developer; there is no leakage after the renovation and there is leakage, the responsibility is in the decoration company. If the bathroom is waterproof, the water will splash on the adjacent wall when bathing. If there is no protection of the waterproof layer, the partition wall and the diagonal wall of the corner will become mildewed, so be sure to prepare the wall surface before laying the wall tiles. Waterproofing, in general, the walls are to be treated with a waterproof height of 30 centimeters, but the non-load-bearing lightweight walls should be waterproofed at least to 1.8 meters high. Special attention should be paid to the corners and strictly prevent the occurrence of drip leaks. In fact, most of the waterproof layer leaks are corners. Therefore, if these places are properly prepared, the possibility of leakage will be reduced. View 2: wall and keel If the wall and the keel violate the rules of operation, they will not be easily found. For example, due to the collapse of the ceiling as a whole or in part, the ceiling becomes a "top drop." View three: Ceiling The combination of the ceiling and the floor and the keel and the veneer is not good, or the load is too large, which can easily cause "falling off." According to the regulations, the ceiling keel shall not be twisted or deformed. The installed keel shall be firm and reliable. The horizontal deviation shall not exceed 5 mm; a chandelier or ceiling fan exceeding 3 kg in weight shall not be hung on the ceiling keel, but shall be separately provided. If the ceiling is made of gypsum board, the thickness should be about 9mm. View 4: Fragment 1, hot and cold water pipes mixed White is a cold water pipe, red is a hot water pipe, and a cold water pipe and a hot water pipe are mixed together. There are hidden dangers: the expansion and contraction rate of hot and cold water pipes is different. Due to thermal expansion and contraction, the cold water pipes burst and leak. Standard operation: distinguish hot and cold water pipes according to color and operate strictly. 2, using glue Normative operation: At present, there is no natural and pollution-free glue on the market. The substitute is 108 glue. However, we must look for better brands and look for products with test reports. 3, no insulation sleeve During the construction, the wires are directly buried in the wall. The wires are not covered with insulating tubes, and the wire connectors are directly exposed. There are hidden dangers: This is very unsafe, and may cause short-circuit of the wires due to some reasons, such as the aging of the wires, resulting in wire breakage; at the same time, once the wire is broken, it cannot be changed at all, only the wall knocks on the ground. Standard operation: The wires must be laid with insulation sleeves on the outside, and the circuit joints should not be exposed on the outside. They should be installed in the line box. No joints are allowed between the distribution boxes. 4, free to change the waterway In the case that the owner did not understand the decoration, he misled the owner to dismantle the waterway at random and wasted money. There are hidden dangers: waste of money is only one aspect. Once it is not sealed or lacks pressure during the demolition of the waterway, it will lead to burst of water pipes. Normative operation: When the pipeline is changed, it will move and it must not be moved when it is not. 5, strong and weak electricity placed together Typical jerry cuts. Put strong electricity (such as lighting wires) and weak electricity (such as telephone lines and network cables) in a tube or box, and store less pipes, saving time and effort. There are hidden dangers: There will be interference when making a call or surfing the Internet. At the same time, too much threading in a pipe also creates a risk of fire. Normative operation: Strong and weak electricity should be routed separately. It is forbidden to share one pipe and one bottom box for strong and weak electricity. 6, the length is not enough without connection accessories Because the length of the insulating tube is not enough, there is exactly a turn here, no connection fitting is placed, and a section is exposed at the intersection with the junction box. There are hidden dangers: If you stay for a long time, it may cause leakage due to the aging of the line. Normal operation: There should be something connected between the nozzle and the junction box. 7, repeat the wiring A large number of repeated wiring, multi-use materials, waste the owner's financial and material resources. There are hidden dangers: Once a problem arises in the line, it is difficult to detect in a layout like the "Tian Luo Di Network." Normative operations: Arranged closely, in the case of no more than 40% of the capacity of the pipe, the same trending line can be worn in a pipe. However, it is necessary to separate strong and weak electricity. 8, the line pipe is damaged by the follow-up project Typical barbaric construction. After the pipeline was laid, it was slotted on the ground again and the pipeline was laid through. Decoration There are hidden dangers: After you check in, you may find that there is no electricity in a room in your home. You can only detect and re-thread all the wires in your home. Normative operation: The construction cannot be performed again in the place where the pipeline is laid. If it is damaged, it is forbidden to wire in the middle when changing lines. When the circuit load is large, the joint of the wire in the threading pipe is easily sparked and a fire occurs. 9, putty when cement Typical shoddy. On many construction sites, the mistakes of the construction team were well-known, and the horizontal slotting did not say that after the wiring of the line pipe was completed, the putty powder was used as cement. There are hidden dangers: The horizontal slotting during the decoration has destroyed the bearing weight of the entire building, and the original design's ability to resist earthquakes has decreased. Normative operation: The cement used to close up the trunking must be consistent with the cement of the original structure to ensure its strength to decorate the home. 10, wire regardless of color All lines use a single color, for the sake of labor. There are hidden dangers: once the line has a problem, the decorative design will once again detect indistinct lines. With the above 10 strokes, even if there is no reason to accompany, the owners can distinguish some. However, if the conditions are better, then there is still a good supervisor to accompany the building materials store because the renovation of the house will not be a small thing at any time. Entrance Decoration Restaurant Decoration Cement Decoration Design Decoration Home Furnishing Decoration Decoration Decoration Company Okay Ceiling Fan Light Bathroom Tile Bathroom Door Bathroom Tile Color Bathroom Ceiling Material Bathroom Ceiling Overall Bathroom Toilet Design Toilet Waterproof Toilet Leakage Decoration Home Tile Decoration Home Improvement According to the different characteristics of the handle, lid, bottom, shape and other parts of the teapot, there are more than 200 basic types of teapots. Tea Pots,Vintage Tea Pots,Small Teapots,Animal Teapots The universe in the stone is great , https://www.zdartwork.com
According to the shape of the handle:
Side lift pot: The handle is ear shaped, opposite the spout.
Handle pot: The handle of the pot is in a rainbow shape above the lid.
Flying Pot: The handle of the pot is above one side of the pot, flying in a colorful ribbon.
Handle pot: The handle of the pot is like a handle, at a right angle to the body of the pot.
No handle pot: no handle, hold the head of the pot to pour tea.
The current construction units are becoming more and more sophisticated. Some construction workers in the building materials store are not afraid of the owners to check on the spot. They think that the owners do not understand anything, do not know well or do well, and do not know well. Therefore, as long as there is no inspection accompanied by supervision, all of them flickered without discussion. Decorative design As the saying goes, an insider takes a look at the door and an outsider looks busy. However, what exactly do we look at in the decoration scene and how do we look at it in order to achieve a multiplier effect? ​​Now, let the supervisor teach you what to look for at the end of the site. Let's say goodbye to the building materials store. Not afraid that the owners came to the site for inspection. They felt that the owners did not understand anything. They did not know well whether they did well or did well. Therefore, as long as there is no inspection accompanied by supervision, all of them flickered without discussion. Decorative design As the saying goes, an insider takes a look at the door and an outsider looks busy. However, what exactly do we look at in the decoration scene and how do we look at it in order to achieve a multiplier effect? ​​Now, let the supervisor teach you what to look for at the end of the site, and let you from that, and beggars to say goodbye to the decoration of the home.