Construction acceptance is not a simple matter. There are a lot of things that owners should pay attention to when they are checked to prevent unnecessary troubles in the future.


Yangtze floor Coron floor

1. At the scene, the owners, designers, project supervisors, and construction managers will participate in the four parties' participation. The purpose is to explain the budget items, drawings, special techniques, and coordinate the relevant procedures to the responsible person on the site.

2. Material acceptance The formal home improvement company needs the owner to check the material before placing it on the construction site. At this time, the industry mainly pays attention to whether it is consistent with the details of the materials on the contract. Only after the owner signs the decoration company can the construction be carried out.

3. Mid-term acceptance In the mid-term acceptance, the owner not only identifies the overall effect of the decoration, but it is more important to check whether the construction quality of the construction is satisfactory. Generally, the following aspects are to be followed.

First of all, check whether the lighting circuit is in line with the regulations, sockets, lighting switches, main gates, leakage switches, etc. must have a certain height, kitchen, air conditioning should use a dedicated line to avoid mutual interference and produce a magnetic field. The TV antenna and telephone line should be installed in a convenient maintenance location.

Second, check whether the drainage is smooth, there is no leakage, backflow and water phenomenon, whether the high-grade plumbing hardware is scratched; then check whether the new stack wall is vertical, whether the water level of the brick is the same, and whether the joint is even and tidy.

Finally check the paint quality, it should be smooth, feel good, and no cracks, at a meter looks no color and nail. The mid-term acceptance requires owners, designers, project supervisors, and construction managers to participate in the inspection. After the acceptance, the quality report can be signed and confirmed.

4. The acceptance of the tail period requires the participation of the owners, designers, project supervisors, and the person in charge of the construction. The overall acceptance of the engineering materials, design, and process quality must be confirmed after signing up.

Links: Construction and acceptance of drainage pipes in kitchen and bathroom decoration

Construction acceptance switch decoration design TV decoration socket home improvement decoration decoration company please floor tile

Medical Product Cases

Medical Product Cases,Medical Supply Eva Case,Medical Tool Carry Eva Case,Waterproof First Aid Kit Eva Case

Dongguan C.Y. RedApple Industrial Limited , https://www.zjhpgbags.com