Bakelite floor installation

First, the floor-free installation of high precision requirements

The gel-free installation of the floor lock has a high requirement for the buckle type design and the precision of the bite, which requires a high quality and processability of the floor substrate to achieve a precise and dense effect.

Second, non-glue flooring moisture treatment

The rubber-free floor must be treated with a tight moisture barrier on the four sides of the floor and around the lock so that after the cut the buckle body and the four sides are tightly sealed, even if there is moisture or accidental flooding, just in time Dealing with products will not be affected. The glue-free installation can increase the construction speed, and also eliminates the need to clean the glue on the floor surface after the construction is completed.

Third, rubber-free floor installation precautions

At present, more than 90% of the floor's problems are caused by poor waterproofing. It should be noted that during the cleaning process, it is inevitable to mop the floor and sprinkle water. Once the water enters the substrate, it will cause damage to the floor.

Fourth, the use of floor glue and performance characteristics

Solvent-free, green products, in line with EU ROHS standards; excellent initial tack and final tack strength; easy construction, economic usage, high coating rate; long open time, long-lasting bonding; suitable for geothermal system base layer.

Fifth, floor glue base treatment

The grass-roots level must be clean and free of debris, smooth and solid, dry and free of cracks. For the excessively water-absorbing base layer, it was treated with a multi-functional water-based interface agent. Rough or uneven bases must be leveled with self-leveling cement. New concrete, mortar layers, etc. must be tested for moisture content, less than 4% before construction can be used, or Hengsheng epoxy moisture-proof primer system for moisture treatment.

Sixth, the use of floor glue

Stir the material evenly before use and use a serrated spatula to evenly apply the coating. Dry the coating for about 5-30 minutes after the sizing (touch the finger to judge the dry condition) to lay the material. After laying the ground material, use a wooden scraper or roller to remove the air and ensure that the adhesive layer is in full contact with the floor material. If necessary, apply heavy weights to avoid joint corners lifting. About 24 hours after the basic curing, about 48 hours after walking on the people.

Seven, the scope of application of floor glue

It is suitable for bonding all kinds of plastic block flooring, floor tiles (below 3.0mm), common coil flooring and carpets and other floor materials on absorbent floors. The glue-free installation can be no longer glued in the case of suspension installation. The implementation of the glue-free installation is achieved by means of some transformations in the manufacturing technology.

Floor floor installation building materials knowledge cement paint floor tiles

Track Linear Light

We diviided the led light according to the using eviiroment. Most of our product is the commercial LED Lighting

Commercial lighting is a term used to describe lighting that is used in commercial spaces, including auto dealerships, distribution centers, churches, factories, offices, and warehouses. Unlike residential lighting, commercial lighting is made to withstand more abuse and has a longer lifespan.

While the focus of residential lighting is often on aesthetics, commercial lighting is task orientated. Commercial lighting systems are designed based on what the application is. For example, in an office-type setting, you may see task lighting, which illuminates specific areas where employees need concentrated light to be able to perform their jobs.

Track Linear Light,Led Linear Light Fixture,Led Linear Lighting,Led Linear Light Bar Fixture

Jiangmen Dilin Lighting High-Tech Co., Ltd. , https://www.jmdilinlighting.com