Bay window decoration entrance decoration paint home decoration cement furniture decoration floor tile floor tile balcony tile Double Glazing Intelligent Glass Double Glazing Intelligent Glass,Laminated Double Glazed Smart Glass,Pdlc Double Glazing Intelligent Glass,Pdlc Smart Laminated Double Glazing Glass Shenzhen YuGuang New Material Co.,Ltd , https://www.ygsmartfilm.com
1, Huangmei season mud tiles process focus
1) During the construction of masonry, the Huangmei season has relatively damp air. If the cement shows that the agglomerate shows that it has been affected by dampness, it must not be used in a lucky manner. The cement that fails has poor adhesion and is easily broken off. In order to save a few small money, it may not be worthwhile to cause wall cracking or collapse in the future.
2) During the laying of tiles and floor tiles, the tiles must be soaked before laying. The time can be slightly less than the non-rainy season. Soaking for one to one and a half hours is enough. Soaking more is a waste of time.
3) For batches of tiles or floor tiles, it is advisable to operate in fine weather conditions during the rainy season, otherwise there will be cracking and yellowing.
2. Huangmei Season Hydroelectricity Process Focus
In the hydropower process, attention should be paid to the normalized operation of the circuit transformation. When the rainy days are renovated, the bare wires cannot be directly buried in the wall or the floor. It must be protected by PVC wires and pipes, especially when it rains on the balcony. In a wet place, be sure to wrap copper wires that are exposed outside the wires during embedding and prevent the wires from short-circuiting after being exposed to moisture. For the wires around wood products such as damp wood keels, block boards, etc., care should be taken that if it is not careful, it may cause fire.
During the Huangmei Season hydropower construction, special attention should be paid to safety. Due to the high humidity in the air, live operation is very dangerous. As much as possible, remind construction workers to wear insulated gloves. Special attention must be paid when operating.
3, Huangmei season carpentry process focus
1) Note that in the Huangmei season, it is not appropriate to make furniture door leaf and other related surface decoration, because the components of the door leaf on the moisture content of the material and the external climate is very demanding, in the Huangmei days make stereotypes of the door leaf in the future use process is relatively easy Deformation. So you should pick more dry weather to make.
2) In the construction process of woodworking, in addition to the need to promptly seal primer treatment on the surface of wood products, in order to prevent the shrinkage of the wood after the moisture content of the wood decreases, the defects such as not tight shut-off and unevenness are required in the wood products. There is a certain margin between the closing line and the slats, and the wooden products should be placed after the production is finished, and the material should be modified after being basically stable.
4, Huangmei season paint process focus
Rainy season decoration is very particular about putty live, home renovation requires putty powder batch inlay twice, but remember, be sure to dry thoroughly after the first pass before grinding and the next batch of batch work, otherwise it will cause Cracked walls. To judge whether putty dry or not teach everyone a way, you can use sandpaper to polish, if the dust does not touch the sandpaper, then it has dried out.
1) Huang Meitian's decoration paint will not be mildewed, but it will be blistering, whitish, and needless to panic, as long as it incorporates no more than 15% of anti-white water in the paint, it can solve this problem.
2) Wooden Paint and Wall Paint No matter what type of paint is applied during the renovation, it must be confirmed that the front has been thoroughly dried to paint another paint, otherwise the paint surface will undergo abrupt changes.
3) During the renovation, special attention should be paid to the paint not to be spotted or exposed. This requires that the material must be dry before the paint can not lock the water in the inner layer.
5, Huangmei season decoration focus
At the later stage of the renovation, during the installation process, special fastening is required to fix the top surface of the object to prevent cracking after the weather is fine.
Because the wall of the Huangmei season is very damp, in order to prevent the back of the furniture from getting wet, we must pay attention to a large area as far as possible not to be placed against the wall. If you need to stay as soon as possible, the wall should first do moisture treatment.
In the rainy season, the impact on the quality of home decor is relatively large, and this time is the off-season decoration. In fact, today's home decoration has adopted a lot of new equipment, new processes, new materials, as long as the reasonable arrangements for the process, make some adjustments during construction, it is also possible to avoid the various unfavorable factors of the rainy days. The decorator can no longer just postpone the relocation of the Huangmei season just because the Huangmei season has arrived. It is entirely possible to choose the decoration time more freely. Nevertheless, the rainy season is different from other seasons after all. The decoration construction also has its own unique features. Need to pay more attention.