Entrance decoration children's room decoration room decoration design switch socket heating Solar And Wind Light,Solar Hybrid Light With Wind,Wind Solar Hybrid Lamps,Solar Wind Hybrid Lamp Yantai LUHAO Lighting CO.,Ltd , https://www.luhaolight.com
1. All exterior finishes, including balconies and rain covers, shall be completed according to design documents. 2. Common parts, public facilities, various pipelines (supplies, platoons, rainwater, warmth, heat), electrical equipment (distribution boxes, cabinets, plates, sockets, switches, lamps, etc.) shall be completed in accordance with design documents. , and complete various test items as required. 3, a variety of pipelines should be carried through the water, pressure test, ventilation test and commissioning of heating and heat inspection and other acceptance work. 4. The roofing project will carry out water storage and watering tests. 5. Where prefabricated floor slabs or cast-in-place roofs are used in each room within the door, it shall be done without plaster and leveled with putty to achieve dense and no cracks on the board seams, and shall be smooth and error-free. The surface shall be smooth and the color shall be substantially uniform. The straight line angle is straight; the concrete on the ground floor of each room within the door should be flat and compacted to achieve firm bonding and no cracks. 6, the room with waterproof requirements should be strictly in accordance with the waterproof layer, protective layer of the building requirements to plan, in the acceptance should be carried out two impoundment test, so that no leakage. 7. The floor drain and the flooding slope meet the design requirements, so as not to pour water, the joint is smooth and smooth, and there is no leakage. 8, the elevation of various floors of cement concrete ground floor, should consider the height requirements for re-decoration.