>>> User American decoration electrician wiring plumbing approach Water reform acceptance notes: Water and fire have long been known to the public and there is no doubt about the importance of water circuit renovation in decoration. Similarly, it seems to me that walking along the water line is as important as the issue of home improvement and environmental protection. Here are some tips for you: (Hidden project acceptance must see clearly) 1, the general use of water pipes in the market is PPR pipe, aluminum plastic pipe, galvanized pipe and so on. The home improvement waterway (water supply pipe) is best to use PPR pipe, because it is connected by heat welding, no water leakage, and the service life is up to 50 years. 2, the waterway reform generally distinguish between cold and hot water pipes. 3, waterway alignment slot should ensure that the buried pipe in the wall, the ground, after the decoration should not be exposed. Slotting should be careful as long as it can be buried in the pipe, do not damage the structural layer. 4, hot and cold water pipe outlet is generally left hot right cool, hot and cold water outlet is generally 15CM. Hot and cold water exports must be parallel. 5. Pipeline pressure experiment should be done after the completion of waterway reformation. The experimental pressure should not be less than 0.6MPa. 6, after the waterway reform is best to have a waterway map, in order to avoid accidentally hit the water pipe in the subsequent decoration! 7, the most important thing is the water reform team, my proposal is still careful choice of professional water reform, electric reform company! Qijia Tips: Several points need to be noticed in the transformation of bathroom waterways: 1) For the shower and shower faucet to leave the hot and cold water interface, when installing the water pipe, you must adjust the angle, it is best to buy the shower in advance, try to install it. Pay particular attention to simply screwing the shower on the tiles before putting them on, and then remove them after installing the tiles and installing them at the end. To prevent the tiles from being fixed when the tiles have been installed, and because of the angle problem, it is not possible to install the tiles again. 2) The water inlet port for the toilet must be adapted to the height of the toilet tank from the floor. If it is left high, it may conflict when the toilet is installed last. 3) Do not install cement in the toilet seat. It is said that it will not be maintained in the future. 4) Wash basin, if you install pedestal, pay attention to the distance of hot and cold water outlet should not be too wide, or to install a pedestal, the width of the pedestal column does not cover hot and cold water pipes, from the front of the pedestal basin, You can see water pipes on both sides. 5) Pressure test (especially cloth dark line) should be conducted after waterway reformation, otherwise sleeping is not stable. 6) Washing machine faucet reserved, mop pool faucet reserved. Hydroelectricity renovation construction acceptance toilet faucet home decoration cement home improvement bathroom tiled bathroom sink bathroom leak Arabic Coffee Maker,Arabic Coffee Maker Electric,Arabic Coffee Maker Machine,Arabic Coffee Maker(Dallah) Kit Ningbo DeNeu Imp. & Exp. Co., Ltd , https://www.deneucn.com