For the construction site for one week Mainly visualize their materials, and examine whether the decoration company's crafts are in line with the scene of the company's work, the decoration of the materials on the construction site, the necessary facilities (such as fire prevention), the completeness of the facilities, and the exchanges between workers and workers, whether there is a temporary consolidation What about a team? A lot of exchanges with workers (remember workers, not foremen) to view the quality of the overall staff, to facilitate the subsequent link, for the environmental protection of materials, should see the decoration company at the scene of the material sampling report, a closer look at the above Marking is consistent with the site material. For the site of the concealed project at Shi From the first section of the complex, and in addition to the pre-embedded circuit, whether it is tidy, whether the interval is fixed according to the specification (normal 50CM), the hardness of the pipe is pinched by hand, whether it is pinched, whether the PVC joint is fixed and whether the fixed part is Solid, for the wiring box, take a foot on the top to see if it can crush, because the junction box is the hidden place where the owner needs to directly face the switch in the future, its quality is important, for the wooden keel ceiling, a To see if the fire paint brushing is uniform, and second, to see whether the scaffolding of the keel, the spacing of the reinforcement bar spacing, for the waterway renovation, decoration companies most likely to cut corners of the joint is to break the beam, such as Pirza, some people with Pilesa , The above logo, the owner is easy to see, Oh, but forgot to look at the joints, Pilesa joints are more expensive than the pipe N times, and the joints directly affect the quality of water supply, because that is the maximum water pressure The bad joints are prone to problems. For the construction site In the middle of the general construction, tiles should be tiled, and the base of the wall is also being processed. The panel surface of the wood board has been installed. Basically, the basic living should be out. The highlight here is that the oil mixing practice is super. Whether the splicing carpenter of the length veneer panel has a chamfered seam or not, some people say that it is the problem of the seaming of the oilworker. Even I think that this is a woodworker, and the oiler uses a small knife to cut the depth and opening degree. In the future, it is easy to spit white, long and dumb joints, whether next to use the reinforcement method, pinch about the strength of tile cement sand, whether there is a level ruler around the tiler, whether with a line, the level is in this construction is still Often used? See if there is any wet cement mark on the site. Check the construction drawings on the site. Can it be constructed according to the original drawing? Can it show the effect on the drawing? Does the staffing of the construction site at half of the construction site have the appearance of a pull person? Now the work site Neatness, and stacking with the remaining piecemeal material. About the post site A. See if it is consistent with the design drawings, the overall perception, first determine whether the cooperation between the designer and the workers is ink-jet B, carpentry look, yin and yang angle work is neat seams neat, the same cabinet decent surface material (pattern is the same), leaving the seams of the practice is the gap neat! C. Oilworker's point of view, whether the paint is sprayed, whether there is an irregular reflection (can be traced back to the use of the material), whether the base putty (oily, water-based) figure foam is even, and whether there is a leak in the polishing (check the sense of responsibility) The most easily forgotten place is the top of the wooden case. Whether the oilworker polishes and makes up the brush (touch it with his hand to see if there is any burr or smoothness)! D. Bricklayer's point of view: find two tools at the construction site, one is a two-meter ruler, one is a square, first feel the gap is neat, and then use the ruler to check the verticality and flatness of the brick, the error rate is as small as possible , The national standard is 2MM, use a square to check whether the tiling of the yin and yang corners is square, where the corners are touched, and whether the grinding angle of the wall tiles is neat, and whether the emptying rate of the wall and floor tiles is less than 5%, look at the putty Is it easy to drop? E. Finally, take a look at the overall effect of the things you do, and see if there are some places where the two types of jobs are transferred. Paint cement decoration decoration company switch decoration find decoration company okay
The Microflow Peristaltic Pump can adjustable the flow rate or speed while the pump is working. And can dispense in a forward or reverse direction, This type of peristaltic pumps also with calibration functions that ensure the high accuracy filling for the user.
You can set the filling time/pause time and copy number on the program. When the set time arrives, the pump will stop automatically and repeat filling depend on the copy number you setting on the program,
The Microflow Peristaltic Pump is suitable for micro-dose filling, And the pump can work with various tube sizes to meet different volume dosing.
If you want the low pulse liquid dosing, the pump head we have 3 roller 4 rollers 6 rollers 10 rollers for your option.
Microflow Peristaltic Pump,Low-Volume Peristaltic Pump,Small Flow Rate Pum,Intelligent Liquid Pump Baoding Chuangrui Precision Pump Co., Ltd. , https://www.chuangruipump.com