The installation of hydropower should pay great attention, because it is a hidden project. Once it is not noticed, it will be very troublesome to change it after installation. Therefore, the precautions for hydropower installation cannot be ignored. What are the precautions for installing hydropower ? Let's learn about it together with Xiaobian! Hydropower installation precautions First, water installation precautions 1. When designing a waterway, it is necessary to first consider which water appliances are used, such as water heaters, washing machines, toilets, wash basins, kitchen sinks, etc., where to put their positions, how to install them, and whether they need hot water. 2, in order to avoid repeated reconstruction of the waterway, before designing, it is necessary to determine whether the bath is gas or electric water heater. 3, the location of the toilet reserved water outlet in addition to wash basin, mop pool, toilet, washing machine, etc., but also to pick one out, to facilitate the subsequent water rushed to the ground. 4, after determining the location of the washing machine can be considered into the wall inside the washing machine drain, so more beautiful. 5, after the waterway reform to do pressure test. 6 The joints of all water pipes should be firm and reliable, and the sealing performance should be better. 7, when the collection of the kitchen, bathroom drain outlet should be checked to see if the water is normal, such as slow drainage should be timely to make the property clear, decoration, the outlet should be protected to avoid the cement tile fell into the drainage outlet Causes clogging. 8, the most important point, the washing machine floor drain can not use deep water sealing floor drain, deep water sealing floor drain leakage is slow, the drainage speed of the washing machine is very fast, the amount is also large, deep water seal leakage can not meet, will lead to water overflow. Second, the circuit installation precautions 1. When installing wires, all wires must wear PVC pipes. The wires in the same pipe must be the same. The size of the wires should be appropriate. The cross-sectional area of ​​the pipe is less than 40% of the cross-sectional area of ​​the PVC pipe. 2. Where there is no shade in the ceiling and there is a wall for force reduction, the wires should be taken from the wall. 3, the degree of bending of the wire is less than 90 degrees. When the wire is over 90 degrees, it should be connected with the tube. The strength of the wires must be cut separately. Reasonable circuit layout 4. The position of the switch socket shall be 1200-1300mm from the ground, and the socket shall be 300-450MM from the ground. The position must be compounded. 5. If the indoor area is more than 40 square meters, air-conditioning lines should be laid 4mm square BV copper wire. 6, three-phase plug electrical appliances, to install a reliable ground. Xiao Bian summary: The above is about water and electricity decoration notices and water and electricity installation knowledge, I hope to help everyone, want to know more related content, you can pay attention to this site information. Hydropower Installation Installation Notes Storage Pouches,Cotton Linen Ravel Storage Pouch,Mesh Nylon Drawstring Storage Pouch,Pouch Pocket For Traveling And Storage Dongguan C.Y. RedApple Industrial Limited , https://www.hpgbags.com