Get ready for renovation after getting a new house, but do not know where to start? This should be a problem that many newcomers will encounter. Indeed, decoration is a very complicated process involving construction materials, electrical appliances, paint, water and electricity. Here, Xiao Bian put together a home improvement process Raiders, detailed introduction to the entire renovation process.

Home Improvement Process I. Home Inspection Home

How can we guarantee the quality of the house, and let us live in a new home? The first is to inspect the house! The inspection room is also a university.

1, waterway

Is the inlet pipe open? What is the waterproof condition of the sewer pipe and the waterproof layer?

2, the circuit

The strong wire (220V) enters the home, is the home line more than 6 square millimeters? Weak wires (telephone network, etc.) do not enter the home, whether the socket has electricity, there is no phenomenon of tripping, this is relatively easy to wrangling, and the new houses are hydropower breakpoints transformation, after the life of the decoration company and the endless playing of the ball in.

3, civil construction

Is the wall level? Is there a crack? Particular attention should be paid to the outer wall. There is no water seepage phenomenon.

4, doors and windows

Is it installed in accordance with the requirements of the purchase contract? How solid is the installation and is there any defect in appearance?

5, indoor area measurement

Detailed measurement of the area used (required for decoration design). Is the area consistent with the purchase contract?

If there is no problem with the above, you can go to the next step!

  

Home Improvement Process II. Home Improvement Steps

1 Pre-design - 2 Property Filing - 3 Main Body Dismantling - 4 Hydropower Renovation - 5 Carpentry - 6 Tiling - 7 Brush Wall Paint - 8 Kitchen Hanging Ceiling - 9 Cabinet Installation - 10 Paving Wallpaper - -11 floor installation -12 wooden door installation --13 radiator installation -14 switch socket lighting installation -15 hardware sanitary ware installation -16 curtain rod installation -17 pioneering cleaning -18 furniture approach -19 Appliance installation - 20 homes are completed, roughly in accordance with these 20 steps.

(I) Pre-design

In the same way, the difference between humans and bees is that the construction of bees is a reflection of instincts. Before humans are built, ideas and frameworks are first formed in the mind. Therefore, if the home improvement compared to a battle, then the pre-design home improvement is the battle of the "war plan" is the home improvement "soul link."

In the previous design, one of the things that my friends must do is to make a detailed measurement of their own room. Don't be lazy. It's best to measure it yourself. The main contents of the measurement include:

1. Identify the area involved in the renovation process. Especially the tiling area, wall paint area, wallpaper area, floor area;

2, clear the main wall size. In particular, it is necessary to design the wall size of the furniture later.

(II) Property Registration

Home improvement decoration designed well, you have to go to the property to do the record, is to do a start permit, you need a set of construction drawings, some scattered signatures, the most important thing is to pay.

(III) Demolition of the main body

Into the construction phase, the main demolition reform is the first project on the first, mainly including the demolition of walls, walls, spade shovel, demolition heating, change steel windows and so on. When the main body is dismantled and reformed, it is to put the framework of the construction site first.

(IV) Hydropower Rehabilitation

Before the transformation of the water circuit, the demolition of the main structure should be basically completed. Prior to the hydropower reform, the circuit reconstruction plan was determined according to the construction plan for the locations of the outlets and outlets reserved by the developers. Work with the electrician on the bottom. For the first measurement of the cabinet, it is also necessary to set the socket plan during this period.

(five) Woodworking

Carpenters, bricklayers, and oil workers are the "three brothers" in the construction process. The basic order of appearance is: wood-tile-oil. The basic appearance principle is - who is dirty and who is the first. "Who is dirty? Whoever is above" is also one of the basic principles that determine the order of home improvement.

  

(6) tiling

Home decoration is in the process of "laying bricklayers" and involves the following two steps of installation:

1. The installation of door stone and marble windowsill. The installation of the door stone can be done together with the paving slabs, or after the paving tiles. The installation of the marble window sill is usually done before the window covering is done. The marble worker will prepare the glass glue and the marble glue.

2, the installation of floor drain

The floor drain is the first one to appear in the home improvement hardware because it needs to be installed together with the floor tile. (However, if the water is removed during the hydropower transformation, the floor drain is only suitable for thin floor drains.) Therefore, when friends first started visiting building materials, they did not have to worry too much. "The bricklayer's second child" leaves the floor. At this time, the cabinet can be measured for the second time. Accurately speaking, the second measurement of the cabinet and the wooden door can be performed after the kitchen tiles are finished.

(seven) brush wall paint

The home improvement “Oil Workers” came into play, mainly to complete the basic treatment of the wall, paint, and paint the furniture used by the “wooden boss”. For friends who are ready to put on wallpapers, they only need to let the “oil worker's third child” do grassroots work on the wallpapered wall. If the wallpaper is installed for a long time, workers can first brush the base film.

(8) Kitchen ceiling

Cupboard ceiling as the installation of the first team, or in the continuation of the home "packaging." At the same time as the kitchen ceiling, the kitchen's moisture-proof ceiling lamp and exhaust fan (Yuba) should have been bought. It is best for friends to install ceiling lights and exhaust fans (bath heaters) at the same time, or to leave heads and openings.

(9) Kitchen cabinet installation

After the ceiling is over, the cabinet door can be installed. If it goes well, one day can be completed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need to test gas.

A lot of friends kitchen and bathroom ceiling waterproof gypsum board with waterproof paint, than the general aluminum buckle plate, PVC buckle plate ceiling should be expensive. The gypsum board ceiling looks relatively flat from the visual, but once there is a problem with the top surface water pipe, or if the leakage above the floor requires downstairs maintenance, etc., the gypsum board ceiling needs to be removed as a whole, which is much more costly than the buckle board ceiling. Therefore, we need to be cautious when choosing plasterboard ceilings.

  

(ten) wooden door installation

On the second day of cabinet installation, as soon as the wooden door measurement was completed more than one month ago, it is now possible to install it. If it goes well, it is also the time of the day. The hinges, door locks, and suctions to be installed at the same time when the door is installed. Prepare related hardware in advance.

If you want the wooden door manufacturers to install window covers and gargles, they should be measured together when the wooden door manufacturers measure them, and they should be installed on the same day that the wooden door is installed. At the same time, the installation time of the marble window sill should be considered wrong. After installation. Remarks: The production period of wooden doors is generally one month. Therefore, in order to make the construction period close together, it is necessary to allow door manufacturers to measure the size of door openings as soon as possible after the completion of main body demolition. With regard to the handling of door openings, we need to pay attention to the fact that if the height of the door openings is inconsistent, the workers need to be treated as if they are equal in height - good-looking.

(11) Floor Installation

The floor can be installed on the second day after the wooden door is installed. If it is smooth, it is also a day. Home improvement decoration floor installation need to pay attention to the following questions:

1, before the floor installation, it is best to allow manufacturers to come and survey whether the ground needs leveling or local leveling, some decoration companies or renovation teams will recommend students leveling or local leveling, to the actual survey of the floor manufacturers prevail;

2. Before the floor is installed, the floor of the home's paving floor should be cleaned and the ground must be kept dry. Therefore, do not use water during the cleaning process.

3, floor installation, if conditions, the floor must be cut in the corridor.

(twelve) paving wallpaper

On the second day after the floor is installed, the home is cleaned up and the wallpaper can be pasted. If it goes well, it will be the same day. If conditions permit, on the day of paving the wallpaper, the floor should be protected; if it is not conditional, it is okay to clean the leftover wallpaper glue on the floor to the original cleaning. Before paving the wallpaper, try to "don't have anything" on the wall.

(13) Radiator Installation

After the wallpaper is laid out, friends who replace the radiator or dismantle the radiator can put the radiator on the wall. Wallpaper - floor - wooden door - radiator, this is a generally recognized correct installation order, first install the wallpaper is to ensure that the foot line and door cover to hold down the wallpaper, and then install the floor is to cover the floor Finally, the radiator is installed because only the wallpaper on the wall can be installed to install the radiator.

The gradual progress of the renovation process is designed under conditions of various constraints and constraints. There are occasional exceptions.

(14) Switch socket lighting installation

Installing light sockets, nothing to say. After the lights were installed, the home was bright and bid farewell to the dazzling glare of the 100-watt incandescent bulbs during the renovation - it felt good.

(15) Hardware Ware Installation

Before buying good plumbing, bathroom accessories, toilets, drying racks, etc., they are all installed.

After those “big things” were installed, the family was still “cold”. After the fixtures and hardware were installed, the family “lived” and really “lived”. It is not an exaggeration to say that the first time you opened the dragon's water and watched the flow of the water “squeaking and squeaking,” it would be beautiful in your heart. The first time you put your toilet in the house, you will have a sense of accomplishment. A good name - "Virgo."

  

(16) Curtain rod installation

The installation of curtain rods marks the end of home improvement.

(17) Pioneering cleaning

Before the pioneering cleaning, do not install curtains. I reminded you in the post on “Interpreting the Curtains”. When pioneering cleaning, homes should not have furniture and unnecessary appliances. Try to keep more "flatness" so that the pioneering cleaning can be thoroughly cleaned.

(18) Entry of furniture

With regard to the purchase time of furniture, it is necessary to first complete the renovation of the water circuit for the home improvement and decoration. In this way, the basic size range of the furniture we choose is only a few. Therefore, some friends have already rushed to set the furniture before the decoration has begun. Personal feeling is not necessary.

(19) Entering home appliances

At this time, the entrance of the appliance to enter the field, the installation of the installation, ready to stay!

(20) Home Accessories

Home accessories, the final step of home improvement, and has been transformed from decoration to decoration, including the installation of curtains are part of home accessories. As for the purchase of curtains, it is best to order furniture to avoid style conflicts. Home accessories also include considerations such as buying some green plants, wall paintings, handicrafts, etc.... In short, after your stay, you are free to play.

The above is the introduction of the home improvement process . This is a very “take heart” article. It is all dry goods and I hope to help you.

Decoration process

Apron Sink

The apron sink front protrudes slightly from the supporting cabinets, eliminating countertops that cause users to lean forward and over-stress. At the same time, this practical design helps prevent cabinet damage. The apron sink is easy to install following this video. Made of high quality stainless steel, this handmade sink is not only anti-corrosion and anti-scratch,but also strong and durable.Its Modern and stylish appearance fits into any style of kitchen.