[China Aluminum Network] Aluminium curtain wall is used for decoration of high-rise buildings. It usually plays a good role in protecting buildings and greatly improves the building's subsidiary performance. In addition, it can also create a good appearance of the building, so that the decorative effect to a higher level. So how can we create a better aluminum curtain wall?
Link
Pin is a device used for fastening/connecting objects or material together, mostly the Link
Pin which QFAP supplied are applied in diggers, excavators, trucks, or
railway equipments.
Most of our customers were from North America,
Europe and Chinese domestic market.
Annual Production Capability: 200,000pcs
Materials: carbon steel, stainless steel, alloys
steel, steel tube, etc.
Surface treatment:
painting, zinc plating, blackening, passivation, nickel plating, oiled, etc.
Heat treatment:
according to customer`s requirement.
QFAP have specialized in
producing high precision Agriculture Parts more than 10years, Because of the
long term cooperation, we could supply our customers not only the products but
also our recommendation on the designs to saving costs.
Link Pin,Linking Pin Model,Link Pin Kit,Link Pin Code SHAOXING QIFENG AUTO PARTS CO., LTD. , https://www.sxqfap.com
It can be considered from the following four aspects: product, design, measurement, and installation. Only by doing a good job of these links can it be possible to create an outstanding aluminum curtain wall system.
The first is the product. The quality of aluminum veneer directly determines and affects the appearance and service life of the aluminum curtain wall. Only the aluminum curtain wall with excellent quality can extend the service life of the aluminum curtain wall.
Followed by the design, aluminum veneer of the color, size, shape a lot, only the design of these factors can be cleverly combined together to create a good effect of the aluminum curtain wall.
Again, the measurement, the measurement accuracy must be controlled within a smaller range, it is not only to save costs, reduce waste, but mainly to prepare for the installation, to create an accurate framework.
The installation is later. Only when the installation is in place can the designer's design concept and intentions be reflected. Therefore, the installation process must also be careful and accurate.